Electronic assembly and EMS manufacturing
Stable quality of water for washing PCB boards, preparing flux, cooling, and humidifying – less sediment, less corrosion, fewer unpredictable downtimes.
Who is it for? For electronic assembly plants (SMT/THT), PCB manufacturers, EMS, electronic service providers, and plants withwith tile cleaners. We select the layout after analyzing technological processes and quality requirements.
Need a quick quote?
Fill out a short form — we will call you back, we will discuss the processes (PCB cleaning,chemical preparation, cooling) and we will propose specific solutions for your line.
Do you want stable process water for PCB washing?
Send us a list of devices (washers, lines, coolers), conductivity requirements, and estimated consumption – we will prepare a step-by-step proposal.
FAQ — frequently asked questions about electronic betting
Can the process water system be connected to several washers at the same time?Yes, we design central systems with a buffer and circulation, which can power several devices simultaneously. We select the efficiency and water storage to meet the peak demand of production lines.
What conductivity of water can be achieved?
It depends on the configuration (RO, mixed ion exchange resin, polishing). For most PCB washing applications, we achieve the conductivity level required by washer manufacturers –the details are determined based on technological requirements and the catalog sheets of the devices.
Will we still need water in canisters?
In many cases, a central purified water system allows for a complete elimination of canisters or limits them to emergency situations. We compare with you the cost per liter of water from your own system and from purchase, so that togetherto choose the optimal investment variant.
What data is needed for the preliminary valuation?
The following are useful: a list of devices using purified water (washers, lines, coolers), requirements for conductivity/water class, estimated consumption per shift/per day, results of the feed water tests, and a few photos of the existing installation and technical rooms.
Will the installation interfere with production?
We plan the work in consultation with the production and maintenance departments. Some of the work is carried out while the factory is operating, and we organize the switch to the new system during short service windows, e.g., on weekends or outside of the main production shifts.
How does the service and monitoring of water parameters work?
We establish a schedule for inspections, replacement of cartridges and consumables, as well as a method for monitoring conductivity (locally or with registration). We can prepare simple reports for the quality and maintenance departments to ensure that water parameters are documented in the plant's quality system (ISO, IATF, etc.).

